Installation Kit (Copper & CU-AL)
Range 1/4", 3/8", 1/2", 5/8", 3/4" Capacity: 3000 sets per day
1. Low pressure pipe : Pipe Carrying low pressure Freon gas from indoor unit to outdoor unit.
2. High pressure pipe : Pipe Carrying high pressure Freon gas from outdoor unit to indoor unit.
3. Insulator : Used for insulating the low pressure pipe and prevent dew formation.
4. Connecting cable : Cable connecting indoor and outdoor units and for activating indoor unit.
5. Drain hose : Used to drain collected in the indoor unit (For extension).
6. Cable tie : Used to tie and fix pipes and drain hose.
7. Flare unit : Used to connect pipes to indoor and outdoor units and prevent leakage of the Freon gas.
8. Tape : Used to finish an nonadhesive taping job.
9. Insulation : Used to insulate low and high pressure pipes.
10. Concrete nail : Used with saddles to fix popes on the wall.
11. Nonadhesive tape : Used to neatly tie low and high pressure pipes, cable and insulator.
12. Saddle : Used to fix pipes on the wall.
13. Putty recon : Used to fill holes remaining on the wall after piping.